Province | Subbasin | % |
---|---|---|
Columbia Plateau | Columbia Lower Middle | 100.00% |
Previous: | Next: |
---|---|
73354 REL 82: 2007-155-00 EXP SUPPORT DESIGN OF YN STURGEON HATCHERY |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Effective implementation management and timely contract administration | B: 119. Contract Development and Direction | 08/31/2024 | 08/27/2024 | |
Water Plan completed | C: 174. Water Evaluations at Marion Drain Hatchery Site | 08/31/2024 | 12/15/2023 | |
Meeting notes | D: 189. Regional Coordination with Sturgeon Researchers and Managers in the Columbia River Basin | 08/31/2024 | 08/27/2024 | |
EC documents | F: 165. STEP 2: Assist with NEPA process contracted by BPA | 08/31/2024 | ||
Final Design Report | G: 175. Preliminary Design of the Marion Drain Sturgeon facility | 08/31/2024 |
Primary Focal Species | Work Statement Elements |
---|---|
Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 119 | Contract Development and Direction | |||||||
C | 174 | Water Evaluations at Marion Drain Hatchery Site | |||||||
D | 189 | Regional Coordination with Sturgeon Researchers and Managers in the Columbia River Basin | |||||||
E | 196 | STEP 2: Master Plan Step 2 Tasks | |||||||
F | 165 | STEP 2: Assist with NEPA process contracted by BPA | |||||||
G | 175 | Preliminary Design of the Marion Drain Sturgeon facility | 08/03/2023 | ||||||
H | 132 | Submit Progress Report for the period (Sep 2023) to (Aug 2024) |